LAUSD PROPOSITION BB PROJECT STATUS FORM
VERNON CITY ELEMENTARY SCHOOL
LOCATION CODE 7493
PROJECT #
PROJECT DESCRIPTION
STATUS
03729-1
REPLACE DETERIORATED FLOOR COVERING
 
05375-1
PAINT ALL CLASSROOMS
 
05375-2
PRE-PAINT REPAIRS, INTERIOR
 
06195-1
REPAIR TRANSOMS
 
06196-1
REPAIR DOORS
 
06198-1
REPAIR DOORS
 
74931-1
LOCALLY DETERMINED NEEDS
 
00212-1
REPLACE BOILER CONTROLS AND WATER MAKE-UP SYSTEM
ASSIGNED
02663-1
REPLACE RADIATOR VALVES & TRAPS
ASSIGNED
09562-1
REPLACE 2 FUSED SUB PANELS IN MAIN HALLWAY
ASSIGNED
09525-1
REPLACE WASTE LINES UNDER BOYS/GIRLS RESTROOMS
CLOSED
00062-1
REROOF BUILDINGS
COMPLETED
06197-1
SANDBLAST AND COLOR COAT WALLS
COMPLETED
7493E-1
CLASSROOMS REQUIRING AC + OFFICE
COMPLETED
7493E-2
NEW SVC: A/C 1997 BOND
 COMPLETED
7493H-2
S&T TRENCHING, DONE WITH BB AIR COND II
COMPLETED
7493K-1
GROUND LEVEL WINDOWS 
COMPLETED
7493C-1
DSA BUILDINGS FOR CSR
IN DESIGN
R1187-1
PLAYGROUND RESURFACING
IN DESIGN
06199-1
REPLACE DETERIORATING CONCRETE
 PLANNING
06996-1
REPLACE WOOD SASH
PLANNING
09526-1
INSTALL SHUT OFF VALVE & REPIPE WATER CLOSET IN BOYS/GIRLS RESTROOM
PLANNING
7493H-1
CLASSROOMS, SAFETY & TECH.
PLANNING
R1421-1
REPAIR/REPLACE DAMAGED SPRINKLER SYSTEMS
PLANNING
04982-1
REPLACE OBSOLETE LIGHTING (PENDANT)
SURVEY
04982-2
REPLACE OBSOLETE LIGHTING (ENERGY)
SURVEY